This morning, the inch high people have been eagerly awaiting the arrival of the new much hyped type 4 express diesel electric locomotive D0260 ’Lion’ recently built by Birmingham Railway Carriage Company’s works in Smethwick. But it looks like there’s been a mix up at The Ministry of Misery with the paperwork, for instead they’ve received a non-working stuffed tiger (or lion in this case) of a shiny museum piece also called ‘Lion’ from the local museum.
The loco crew aren’t too impressed, for they had to push the whole train by tractor for the last 2 miles, and now the weather is changing and it’s starting to rain. The crew were hoping for a nice warm dry cab to spend the morning in putting the new shiny diesel loco though it’s paces around the dockland lines.
The man in charge, Barry Bullhead from The Ministry of Misery (that’s him with the bowler hat), unusually and most out of character, has bought a crate of 9% cider to try to alleviate the situation. He’s realised that the chances of him being left on his own with the non-working engine in the rain are quite high, whilst everyone else heads for the pub leaving him to return the engine single handed to the museum before they notice it’s missing.
Help support the nonsense www.buymeacoffee.com/Nevardmedi3
No comments:
Post a Comment
All posts will be approved before they go live, posts from spammers will be deleted and marked as spam.