Saturday 20 April 2013

Polbrook Gurney Colliery Update: Sat 20 April

A couple more snaps of the trainset.....
Railex is just 5 weeks now and I've so much to do...
  • Build 2 fiddle yards (with split height rail access for the different exit points).
  • Build some more cassettes.
  • Build the rear of the pub which previously was up against a backscene.
  • Build 2 loading screens and a bridge carrying a narrow gauge tub /spoil line over the right hand exit points (in progress with code 40 rail)
  • Paint the diorama case.
  • Hope the drape I use for all layouts will (should be fine) will fit.
  • Hope it fits in the back of my old Mondeo with its 2 foot high backscene (a tape measure suggests it will).
Things that probably wont be ready for Railex
  • Cosmetic fishplates for the flatbottomed Colliery sections
  • Cosmetic point rodding
  • Lineside fencing.

3 comments:

  1. Probably a good thing you don't have a full time job to fit in with all this!

    ReplyDelete
  2. I'm in the lucky position to have toy trains as the day job these days. I never get moaned at these days. Penniless but beats an office any day.

    ReplyDelete
  3. Jealousy will get me nowhere. Keep the pics and commentary coming.

    ReplyDelete

All posts will be approved before they go live, posts from spammers will be deleted and marked as spam.